470-Tonne Structural Steel Fabrication Order for Moscow, Russia

Project Overview
Bingfa Steel fabricated 470 metric tonnes of white-finished structural steel members for an order destined for Moscow, Russia. This case documents member preparation, bundling and transport packing at the factory, together with loading experience reported for this operation.
The confirmed scope covers fabrication, packing and preparation for dispatch to Moscow. It does not establish responsibility for structural design, installation in Russia or completed construction.
| Item | Confirmed information |
|---|---|
| Destination | Moscow, Russia |
| Fabrication quantity | 470 metric tonnes of structural steel |
| Members shown | White-finished structural steel members |
| Packing | Bundled and stacked members with transport supports and spacers |
The fabrication quantity is not a record of the quantity already loaded or shipped. The total number of containers is not confirmed.
470-Tonne Fabrication Order
The 470-metric-tonne quantity describes this structural steel fabrication order. The white members shown in the selected photographs are associated with the Moscow order; blue and yellow members visible in the background belong to other orders.
The photographs provide a view of the prepared members and factory packing arrangements. They do not establish the building’s use, steel grade, coating system or compliance with a particular Russian design standard.
Steel Member Preparation
The selected views show white-finished members grouped in stacks, with securing straps and spacers visible between or around the bundles. The white appearance alone does not identify the paint chemistry or coating specification.
For a new fabrication enquiry, provide the available drawings and revision status, member schedules, quantities and specified finish requirements. Project-specific materials, fabrication requirements and inspection documents should be confirmed in the quotation and agreed supply scope.
Bundling and Transport Packing
The Moscow members were bundled and stacked with transport supports and spacers. Timber separators and securing straps are visible in the selected photographs. These are packing and handling arrangements, not structural foundation piles.
For another order, the packing arrangement should be reviewed for the actual member sizes, package weights, lifting or forklift access and transport route. The photographs do not establish a support capacity, stacking limit or carrier acceptance for other cargo.
Container Loading Operation
Bingfa reported approximately 30 minutes per container for factory loading in this operation, and a daily loading capability of up to 15 containers under suitable working conditions. These figures describe this operation’s experience and are not fixed loading-time or daily-output guarantees for all orders.
Actual loading arrangements depend on cargo preparation, package configuration, handling equipment, personnel and container availability. The reported figures should not be used to calculate the number of containers in this order or to conclude that all 470 metric tonnes have been loaded or shipped.
Real Factory Photographs
The opening photograph and the close-up below show the white Moscow-order members. Other coloured steel in the surrounding factory yard belongs to separate orders and is not included as evidence of the 470-tonne order.

Request a Structural Steel Fabrication Quote
Share the available project drawings, member list and quantities, required finish, delivery destination and intended schedule. Identify any pending information and the packing or loading services you want included so Bingfa can clarify the fabrication and supply scope for your enquiry.