Nigeria 3,120 m² Warehouse Steel Structure Project

Project Record | Nigeria | Status confirmed: 2 November 2026

Bingfa is responsible for design and steel structure supply for a 3,120 m² warehouse project in Nigeria. The recorded steel quantity is 102.35 tonnes. As of 2 November 2026, the project components remain at the factory and are being prepared for dispatch.

Fabricated steel members with end plates and connection plates for a warehouse project in Nigeria.
Steel members for the Nigeria warehouse project at the factory before dispatch.

Project at a Glance

ItemConfirmed project information
Project countryNigeria
Building useWarehouse
Project area3,120 m²
Recorded steel quantity102.35 tonnes (t)
Bingfa’s scopeDesign and steel structure supply
Current stageAt the factory; preparing for dispatch.
Status confirmation date2 November 2026

Steel Components at the Factory

The photographs show H-section steel members, end plates with bolt holes, connection plates and stiffeners. Several stacks are separated by timber spacers. Other images show bundled round-section steel members and steel stair-tread assemblies.

Stacked H-section steel members with connection holes, separated by timber spacers.
H-section members stored on timber spacers at the factory.
Rows of steel members with connection plates, bolt holes and stiffeners.
Connection plates and stiffeners visible on the project steel members.
Bundled round-section steel members with end connection plates and timber spacers.
Round-section steel members bundled with timber spacers.

Component Markings and Fabrication Details

The close-up photograph shows the marking GL3-8 on steel members. The images document visible component markings and connection details; dimensions, grades and inspection results are not stated in this photo record.

GL3-8 identification marks visible on the surfaces of steel members.
The GL3-8 member marking is visible in this close-up photograph.
Stacked steel stair-tread assemblies with patterned tread plates and end connection holes.
Steel stair-tread assemblies photographed with the project components.

Preparing for Dispatch

Bingfa’s confirmed work on this project comprises design and steel structure supply. The current record covers the components at the factory while preparations for dispatch are under way. It does not show shipment, arrival in Nigeria or site installation.

For an overview of warehouse building supply, see our steel warehouse buildings page. Further published project records are available in Projects.

Discuss Your Warehouse Project

Share your project location, intended use, building dimensions, available drawings and required supply scope. These details provide a starting point for discussing your warehouse steel structure requirements.