Steel Workshop Bay Spacing: How to Compare 6m, 8m and 9m Layouts

Why Bay Spacing Deserves a Side-by-Side Comparison

A buyer comparing 6m, 8m and 9m bay spacing is usually looking at the same workshop footprint and asking whether fewer frames will reduce the total project cost. Frame count is only one part of the answer. The comparison also involves the primary frames, secondary steel, bracing, connections, crane supports, foundations and the local construction scope outside the steel supplier’s quotation.

This article uses one hypothetical 72m-long workshop to show how to structure a like-for-like comparison. The geometry is fixed for the example, but the structural design, steel quantity and total cost still require project-specific engineering and commercial review.

The 72m Comparison Layouts

The example assumes the same building width, clear height, intended use, design loads and enclosure requirements for all three options. Only the longitudinal frame spacing changes.

LayoutLongitudinal frame spacingNumber of baysNumber of frame linesNominal internal-frame roof-load tributary width (assumed geometry)Nominal purlin support span between adjacent frames (assumed geometry)End-wall note
Option A6 m12 bays13 frame lines6 m6 mEnd-wall frames may differ from internal main frames
Option B8 m9 bays10 frame lines8 m8 mEnd-wall frames may differ from internal main frames
Option C9 m8 bays9 frame lines9 m9 mEnd-wall frames may differ from internal main frames

The tributary width and purlin support span shown above are geometric assumptions for the example only. The nominal purlin support distances assume purlins are supported at adjacent frame lines without intermediate supports. These geometric distances are not final member design spans. They are not member designs, steel-weight calculations or economic rankings. End-wall frames, braced bays and crane columns may use different configurations from the internal portal frames. Not every frame line should be assumed to have the same foundation arrangement.

72m Workshop — Longitudinal Frame Layout Comparison

Scroll horizontally to compare all three layouts.

Hypothetical 72m workshop bay spacing: 6m, 8m and 9m layouts Three longitudinal frame-line layouts share the same hypothetical 72m overall length. The 6m layout has 12 bays and 13 frame lines. The 8m layout has 9 bays and 10 frame lines. The 9m layout has 8 bays and 9 frame lines. All frame-line counts include both ends. End frame lines may differ. This is not a Bingfa project or structural design. Nominal geometric distances are not final member design spans. Compare longitudinal frame lines over the same 72m length Hypothetical Layout — geometry only Longitudinal direction 72m overall length Frame-line positions below are measured in metres 6m spacing 12 bays · 13 frame lines Both end lines included 0 6 12 18 24 30 36 42 48 54 60 66 72 6m 8m spacing 9 bays · 10 frame lines Both end lines included 0 8 16 24 32 40 48 56 64 72 8m 9m spacing 8 bays · 9 frame lines Both end lines included 0 9 18 27 36 45 54 63 72 9m End frame lines may differ. Nominal geometric distances are not final member design spans. Hypothetical Layout — not a Bingfa project or structural design.
Hypothetical Layout — not a Bingfa project or structural design. The comparison shows frame-line geometry, not steel quantities or cost rankings.

Terminology: Five Different Dimensions

Bay spacing discussions often mix up several dimensions. They should be kept separate.

  • Longitudinal frame spacing (bay spacing) — the distance between adjacent main frames along the building length. This is the dimension that changes in the 6m, 8m and 9m comparison.
  • Building transverse span — the horizontal distance between the main supporting column lines across the building width. It is not simply the same as a clear internal width, because column dimensions and cladding lines can affect usable space.
  • Roof purlin spacing — the distance between adjacent roof purlins, measured along the roof slope or across the roof plane.
  • Purlin support span — the distance a purlin spans between its supports, typically the spacing between adjacent frames or secondary supports.
  • Internal column grid — the layout of columns inside the building, if any. This is a separate design decision from the longitudinal frame spacing.

The 6m, 8m and 9m options are comparison scenarios for this article. They are not fixed Bingfa supply specifications and not a universal requirement in any country. The appropriate bay spacing should be determined by the project engineer based on the building use, loads, crane requirements, cladding and applicable design code.

How Bay Spacing Changes Load Collection

Increasing the longitudinal frame spacing generally increases the roof area that each internal main frame collects. In the example, the nominal tributary width increases from 6m to 8m to 9m for an internal frame with equal spacing on both sides. The purlin support span between adjacent frames also increases in the same way.

That does not mean the frame member sizes simply scale with the spacing. The actual member forces, deflection, connection demand and foundation reactions must be calculated for each layout. The frame that works at 6m may not be the same section at 9m. The purlin and girt sections may also change. The bracing arrangement may need to be reviewed. The comparison should therefore separate the geometric parameters that can be checked directly from the engineering results that must be recalculated.

Why Fewer Frames Does Not Automatically Mean Lower Cost

Fewer frame lines can reduce the number of frames and connections. Whether this also reduces the number of crane-support locations depends on whether the runway beams are supported by the main-frame columns or by independent crane columns. It can also reduce some erection activities. However, the remaining frames may carry a larger tributary load and may need heavier sections, different haunches or revised connections. The secondary steel may need to span further or be supported differently. The foundation reactions may change, and the local foundation cost may increase or decrease depending on the actual reactions.

The net effect on total project cost depends on the balance between these factors. It cannot be determined from the frame count alone. A comparison that looks only at the number of frames is not a cost comparison. For broader cost factors, see the steel workshop building cost guide.

How Each Layout Affects the Building Systems

Primary steel frames

The frame spacing affects the tributary roof load and the frame design. The engineer should confirm the member sizes, haunch details and connection design for each option. Frame configuration is discussed in more detail on the steel frame workshop page.

Secondary steel and connections

Purlins and girts span between frames or secondary supports. A wider frame spacing increases the purlin support span and may change the purlin section, spacing or connection details. The buyer should ask the supplier to state the purlin and girt assumptions in each quotation.

Bracing and stability

Longitudinal bracing is typically located in specific bays. The number and position of braced bays may need to be reviewed when the frame spacing changes. The bracing arrangement affects the stability system and the load path to the foundations.

Crane runway beams and supports

If the workshop includes an overhead crane, the runway beams are supported by the frames or by separate columns. The frame spacing affects the runway beam span between supports and the load transferred to each support. The crane supplier’s data and the structural engineer’s review are both required.

Foundations and column bases

The foundation arrangement should be determined from the column-base reactions, end-wall structure, crane-support arrangement and local ground conditions, rather than assuming that every frame line requires a separate foundation. End-wall frames, braced bays and crane columns may differ. The foundation reactions should be checked for each layout. The foundation design is a local civil/structural scope and is not automatically included in the steel supplier’s EXW quotation.

Openings, equipment and cladding

Door and window openings, equipment interfaces and cladding layouts must be coordinated with the frame positions. A change in bay spacing can move the frames relative to the openings. The buyer should confirm that the proposed spacing works with the actual opening schedule and cladding system.

Purchase Comparison Matrix

The matrix below separates what can be compared directly from what must be redesigned or recalculated.

Comparison categoryWhat can be compared directlyWhat requires redesign or recalculationInformation to requestHow to keep EXW quotations comparable
Building geometry and frame countBuilding length, width, clear height, bay count and frame-line countUsable internal width after columns and claddingConfirmed building dimensions and layoutUse the same building geometry and design basis for all options
Primary steel frame and connectionsGeneral frame arrangement and scope descriptionMember sizes, haunches, connections and steel quantityEngineer’s frame design and connection details for each optionConfirm that each quote covers the same primary steel scope
Secondary steel (purlins, girts) and connectionsNominal purlin support span and general layoutPurlin and girt sections, spacing and connection detailsPurlin and girt schedule for each optionConfirm that secondary steel is included on the same basis
Bracing and stability systemGeneral bracing conceptBraced bay locations, bracing members and connectionsBracing layout and design for each optionConfirm that bracing scope is included and not excluded
Foundations and column reactionsGeneral foundation scope boundaryColumn base reactions, foundation sizes and local designReaction schedule from the engineer; local foundation design separatelyKeep foundations outside the EXW steel quote and compare local costs separately
Crane runway beams and supports (if applicable)General crane support conceptRunway beam span, supports, brackets and connectionsCrane supplier data and runway support designConfirm whether crane-support steel is included in each EXW quote
Openings, equipment and cladding interfacesOpening schedule and general interface requirementsFraming around openings and cladding coordinationDoor schedule, equipment layout and cladding detailsConfirm that all options use the same opening and cladding assumptions
Fabrication scope and EXW supply boundaryListed supply items and exclusionsAny scope item that differs between quotesWritten EXW scope, inclusions and exclusionsNormalize the EXW scope before comparing totals
Local civil, transport and erection costsLocal scope descriptionLocal foundation, transport, unloading and erection costsSeparate local quotationsCompare local costs separately from the EXW steel quote
Commercial terms and exclusionsCurrency, date, validity and stated exclusionsAny commercial condition that differsWritten commercial terms for each optionConfirm that all quotes use the same currency and validity basis

Keeping Three Options Comparable

Before comparing totals, align the following items: the same building length, width and clear height; the same design basis and load inputs; the same roof and wall cladding specification; the same crane requirements if applicable; the same opening schedule; and the same EXW supply scope.

If one quotation assumes a different cladding system, a different crane requirement or a different scope, the comparison is not like-for-like. Ask the supplier to restate the quotation on the same basis, or identify the difference and compare it separately. For internal column-grid context, see the steel warehouse column spacing guide.

Discuss Your Workshop Frame Layout

What the Steel Supplier’s EXW Quote Covers

Bingfa’s steel structure quotation is based on the confirmed EXW supply scope. It may include the primary steel frame, secondary steel, bracing, connections and any agreed enclosure or accessory items. It does not automatically include local foundations, local civil works, transport, unloading, site erection, local permits or any other work outside the written scope.

The buyer should compare steel suppliers on the same EXW basis, and compare local foundation, transport and erection costs separately. A lower EXW steel price does not necessarily mean a lower total project cost if the local scope differs.

Questions to Ask the Engineer and Supplier

  • What frame member sizes and connection details are assumed for each option?
  • What purlin and girt sections and spacings are assumed for each option?
  • How is the bracing system affected by the frame spacing?
  • What column-base reactions apply to each option, and how do they affect the local foundation design?
  • If a crane is required, how are the runway beams and supports affected?
  • Do any openings, equipment interfaces or cladding details conflict with the frame positions?
  • What is the exact EXW supply scope, and what is excluded?
  • What are the quotation currency, date and validity?

These questions help compare the options on a consistent basis and expose hidden scope differences.

Frequently Asked Questions

Does a wider bay spacing always reduce the total steel weight?

No. A wider bay spacing reduces the number of frame lines, but each internal frame may collect more roof load and require heavier sections, revised connections or different secondary steel. The total steel weight depends on the engineer’s design for each option and cannot be determined from the frame count alone.

Can I compare the three options using the same foundation design?

Not without verification. The column-base reactions may differ between the three options, and end-wall frames, braced bays or crane columns may have different foundation requirements. Each layout’s reactions should be checked before the local foundation design is confirmed.

Is 6m, 8m or 9m a standard bay spacing?

None of these is a universal standard. They are comparison scenarios for this article. The appropriate bay spacing depends on the building use, loads, crane requirements, cladding system and applicable design code. The project engineer should determine the suitable spacing for the actual project.

What should I check in a steel supplier’s quotation for each option?

Check the EXW supply scope, the primary and secondary steel included, the bracing and connections, any accessories, the currency, the quotation date and validity, and the exclusions. Confirm that each quotation is based on the same building geometry, loads, cladding and crane requirements.

Request a Comparable Steel Workshop Quote

Technical References

These references support general engineering principles only. They are not Bingfa design standards or project-specific design results.